HOUSE32,District601,STREET18,ALMANSOUR
Sa - Th: 09am - 07pm

Projects

 
No.Project NameDescriptionCost
1Underground Cables (132kV)Supply, Install, Connect, Testing and Commission of (132kV) Underground Cables (1*2000 mm²) & Accessories.Click here to download the full project details97,595,202.00 USD
2Asphalt Oxidation PlantProject for production of oxidized asphalt from the remaining black oil from atoms. Distillation.Click here to download the full project details 15,000,000.00 USD
3Ni-Cd BatteriesSupply (Ni-Cd) Batteries.Click here to download the full project details1,733,600,000.00 ID
4AL-KEFEL SchoolConstruction of 12 & 18 Classrooms for AL-KEFEL School.Click here to download the full project details3,009,098,500.00 ID
5Water Complex PowerElectric Power Feeding for Water Complex.Click here to download the full project details747,365,000.00 ID
6Heat ExchangersProvision of supplying Heat Exchangers for PTF upgrading.Click here to download the full project details597,000 USD
7Spare PartsPower Plant Spare Parts and Automation Control Devices.Click here to download the full project details250,000,000.00 ID
8Sub-Station FoundationErection New foundation of 400KVA Sub-Station (Wasite).Click here to download the full project details547,100,000.00 ID
9Al-khajia ElectricityExtension & Renewable of the Electricity Distribution Network of Al-khajia District in Wassit Province.Click here to download the full project details7,429,260,000.00 ID
1033KV Feeding SourcesSurvey, Design, install feeding sources 33KV including supplying, testing and laying cables (1*400mm²).Click here to download the full project details9,888,126,000.00 ID
11Al-Kadhimiya NetworkRehabilitation of Distribution Electric Network of district -413- Al-Kadhimiya city.Click here to download the full project details8,193,650,000 ID
12Shaikh Saad FeederRehabilitation of Al-Masandik Power feeder of Shaikh Saad.Click here to download the full project details2,749,661,500.00 ID
13Ahmed Bin Al-Kadhim ShrineReconstruction Ahmed Bin Al-Kadhim Shrine.Click here to download the full project details833,362,000.00 ID
14Al-Habana SubstationInstalling, Testing, and Commissioning of 4 Feeders to 33/11 KV (al-Habana substation).Click here to download the full project details773,150,000.00 ID
15Towers: Diyala-KirkukSupply, Execute Concrete Foundation Works, Assembly and Installation Towers between Diyala and Kirkuk station 400 KV.Click here to download the full project details2,250,000,000.00 ID
16Towers: Al-Aziziya-DaboniSupply, Execute Concrete Foundation Works, Assembly and Installation Towers between Al-Aziziya station – Al-Daboni – Wassit 400 KV.Click here to download the full project details1,400,000,000.00 ID
17Hurria Cable TrenchExcavation of Cable Trench and Laying HV & LV Underground cables for Kiosks in Hurria city – Baghdad.Click here to download the full project details98,485,000.00 ID
18Al-Muthanna Prison FenceExecution of Concrete Fence for Central Prison in Al-Muthanna Airport.Click here to download the full project details345,000,000.00 ID
19Bin-Hassan CreekRehabilitation & Development of Bin-Hassan Creek.Click here to download the full project details1,989,491,550.00 ID
20PET PlantSheet & Thermo-Forming PET Plant.Click here to download the full project details5,763,309,000.00 ID